BUILDING CONSTRUCTION BUDGETARY COST
Our Building Construction Prices are budgetary only. All prices stated below include a general allowance for foundation and external works as well.
TYPES OF DEVELOPMENT | COSTS PER CONSTRUCTION FLOOR AREA(LOW – HIGH) PHP/SQM |
|---|---|
Standard office building | ₱50,000–₱65,000/sqm |
Prestige or high-end office | ₱72,000–₱95,000/sqm |
Standard shopping center | ₱42,000–₱55,000/sqm |
High-end retail mall | ₱58,000–₱85,000/sqm |
Budget or 3-star hotel | ₱62,000–₱80,000/sqm |
Business 4- to 5-star hotel | ₱72,000–₱120,000/sqm |
Luxury 5-star hotel or resort | ₱105,000–₱195,000/sqm |
Integrated hotel or casino | ₱130,000–₱220,000+/sqm |
Basic warehouse or industrial shell | ₱28,000–₱38,000/sqm |
Light- to medium-manufacturing facility | ₱38,000–₱50,000/sqm |
Primary and secondary school | ₱37,000–₱52,000/sqm |
Student residence or dormitory | ₱41,000–₱55,000/sqm |
Sports or leisure center | ₱62,000–₱90,000/sqm |
General hospital | ₱75,000–₱90,000+/sqm |
Standard office or BPO fit-out only | ₱34,000–₱58,000/sqm |
Executive or premium office fit-out only | ₱57,000–₱92,000/sqm |
Important Notes:
- The stated rates are budgetary construction estimates only and are intended for preliminary planning, feasibility studies, and early-stage budgeting. They are not fixed quotations or guaranteed contract prices.
- Rates are expressed in Philippine pesos per square meter of total construction floor area and may vary depending on the project type, number of storeys, structural system, building height, design complexity, specifications, and level of finish.
- Actual costs may be affected by project location, site accessibility, soil condition, terrain, excavation requirements, labor availability, material prices, transportation, fuel costs, construction schedule, and market conditions.
- Projects requiring imported materials, specialized equipment, large glass systems, high-end finishes, smart-building systems, or accelerated completion may exceed the stated ranges.
- Commercial, industrial, hotel, healthcare, school, and institutional projects must be evaluated individually because their mechanical, electrical, plumbing, fire-protection, security, and operational requirements differ significantly.
- Office and retail fit-out costs should not automatically be added to base-building costs unless the base-building estimate excludes interior finishes and tenant improvements.
- A reliable project cost can only be prepared after reviewing the architectural, structural, mechanical, electrical, plumbing, fire-protection, and civil plans, together with the detailed specifications and scope of work.
- Clients are encouraged to consult licensed architects, professional engineers, quantity surveyors, and qualified contractors before making financial or construction commitments.
Typical Exclusions:
Unless specifically included in a written proposal, the budgetary rates exclude:
- Land acquisition and land-development costs
- Architectural, engineering, consultancy, and project-management fees
- Geodetic surveys, soil tests, environmental studies, and laboratory testing
- Building permits, clearances, licenses, utility applications, and government charges
- Value-added tax, local taxes, duties, transaction fees, and financing costs
- Demolition, relocation, clearing, major excavation, dewatering, and abnormal foundation works
- Retaining walls, slope protection, major drainage, roadworks, and extensive site development
- Perimeter fences, gates, guardhouses, parking structures, and external covered areas
- Landscaping, irrigation systems, swimming pools, fountains, and other water features
- Deep wells, water-treatment systems, septic tanks, sewage-treatment plants, and major utility infrastructure
- Power substations, transformers, generators, solar-energy systems, and battery storage
- Data centers, commercial kitchens, laboratories, clean rooms, cold storage, medical equipment, and specialized industrial systems
- Loose furniture, appliances, office equipment, movable partitions, décor, artworks, and owner-supplied materials
- Tenant fit-out, branding, signage, and merchandising installations unless specifically stated
- Temporary facilities, off-site works, utility upgrades, and extraordinary logistics beyond the defined project boundary
- Price escalation caused by delayed approvals, design changes, material shortages, foreign-exchange movement, or force-majeure events
2026 Budgetary Construction Cost Guide
Updated for preliminary planning in Cebu and nearby areas. The rates shown are indicative only and may change without prior notice due to fluctuations in labor, materials, fuel, transportation, foreign exchange, market conditions, project location, and design requirements. Final pricing is subject to complete plans, specifications, site inspection, and an approved scope of work.